Solutions

Start where the scrap is.

Every additive floor already counts scrapped builds, CT hours, coupon campaigns, idle machine time and failed qualifications. Powdrix lands on one of those numbers, on one machine, with a baseline agreed in writing, and expands when it moves.

6 wedges1 machine to startBaseline agreed in writing

run_7c2e4b · agent graph · PBF-2 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.job ✓ SUCCEEDED 02 · parttwin twin.simulate ✓ SUCCEEDED 03 · prep_parameter prep.release ✓ SUCCEEDED 04 · recoat_powder recoat.check ✓ SUCCEEDED 05 · melt_layer melt.stabilise ✓ SUCCEEDED 06 · thermal_distortion thermal.compensate ✓ SUCCEEDED 07 · orchestrator approve.human ◆ APPROVAL 08 · robot_handling handle.depowder ✓ SUCCEEDED 09 · defect_inspect inspect.ct ✓ SUCCEEDED 10 · quality_conf release.qualify ✓ SUCCEEDED

Illustrative scenario: PBF-2 · Ti-6Al-4V bracket family, 24-part build, 23 of 24 parts released, one held

By outcome

Six wedges, each with a metric the floor already has

The first paid pilot targets one of these. The metric column is what the pilot would be judged on.

Scrapped builds

Metal PBF printers

Predict porosity, lack of fusion and keyholing from the melt-pool signal and trim inside the envelope before the layer fuses. Metric: builds scrapped and build-failure rate against the baseline.

Meltrixagent.melt_layer

Hidden porosity

Qualified part families

Segment every CT volume on GPUs, grade against acceptance criteria with a sign-off, and link each defect to its layer. Metric: CT triage time and detection accuracy against the inspector baseline.

Poroscanagent.defect_inspect

Coupon campaigns

New part families and alloys

Simulate thermal field, stress and distortion for candidate recipes before the build and release the winner inside the envelope. Metric: coupon builds and ramp scrap per new part family.

Parttwintwin.parttwin

Recoat and powder faults

Long builds

Check the recoater image every layer, track lot, reuse and humidity, and correct dosing before fusion. Metric: recoat-linked build stops.

agent.recoat_powder

Idle machines

Multi-machine floors

Unload, depowder and transfer parts on build complete and schedule machines, ovens, HIP and inspection with cuOpt. Metric: machine idle time between builds and manual handling hours.

ForgebotYieldex

Failed qualifications

Aerospace and medical floors

Keep an immutable genealogy from recipe to disposition and block shipment when evidence is incomplete. Metric: qualification cost and non-conformance cycle time.

Yieldexagent.quality_conf
Where it pays

Four loops, four metrics

Powdrix is not a dashboard. Each agent closes a loop an additive floor already measures in scrapped builds, failed qualifications, CT hours and idle machine time. The tables show what each loop watches and what it is allowed to move.

Melt-pool instability

Catch the pore before the layer fuses

Melt-pool video, photodiode and thermal streams are fused at the printer edge into a rolling risk score for porosity, lack of fusion and keyholing. When risk crosses the threshold the agent has layers, not hours, to trim power inside the envelope instead of scrapping the build at CT.

  • Vision, photodiode and thermal fused at 30 to 240 fps
  • Prediction seconds ahead, not review after the fact
  • Every precursor, action and CT outcome labelled into the training set
agent.melt_layer SUCCEEDED
Catch the pore before the layer fuses: signals watched and parameters moved
SignalWatchesMoves
Melt-pool signatureWatched per layer, per partPower and speed trim inside the envelope
Keyhole and spatterClassified from video and photodiodeFocus and speed recommendation
Lack-of-fusion riskScored continuouslyTrim, CT priority flag, or hold request
Recoat and powder

Stop the streak from becoming a scrapped build

A recoat fault at layer 400 ruins a build that finishes a day later. Recoat-and-Powder reads the recoater image every layer, tracks lot, reuse and humidity, and corrects dosing or asks for a hold before the next layer is fused.

  • Recoater image and bed uniformity map checked every layer
  • Powder lot, sieve and reuse history carried into genealogy
  • Short feeds and streaks corrected before fusion
agent.recoat_powder SUCCEEDED
Stop the streak from becoming a scrapped build: signals watched and parameters moved
SignalWatchesMoves
Bed uniformityRecoater camera, every layerDosing and recoat speed inside limits
Powder qualityLot, reuse count, humidityReuse limit and sieve request
StreaksDetected before fusionHold request to the orchestrator
Inspection

Grade every part, in minutes, with the evidence attached

Spot CT on a sample and hours of manual review cannot keep pace with serial production. Poroscan segments every volume on GPUs, grades against the acceptance criteria with a human sign-off, and links the defect back to the layer and the signal that produced it.

  • 2D and 3D CT segmentation served on Triton
  • Criteria-aware grading with a named sign-off
  • Qualification packet assembled with citations
agent.defect_inspect SUCCEEDED
Grade every part, in minutes, with the evidence attached: signals watched and parameters moved
SignalWatchesMoves
Porosity and cracksCT volume segmentationAccept, reject or inspector routing
Surface faultsVision inspectionRework or reject suggestion
GeometryMetrology deviationCompensation feedback to Parttwin
Before the build

Rehearse the build on the twin

Every recipe is simulated for thermal field, residual stress and distortion before release. Candidates that save takt but push distortion or predicted density outside target are discarded automatically, and the winner is stress-tested against rare defect scenarios.

  • 10 to 40 candidate recipes per part family
  • Ranked on density, geometry, takt and energy
  • The chosen recipe is released inside the envelope and logged
twin.parttwin SUCCEEDED
Rehearse the build on the twin: signals watched and parameters moved
SignalWatchesMoves
Orientation and supportsThermal and stress simulationValidated recipe to Prep-and-Parameter
ParametersMelt-pool proxy and density predictionEnvelope-checked recipe to Meltrix
DistortionAs-built versus as-designedCompensation and predicted-defect map to Poroscan
Segments

Where additive floors start

Aerospace, medical and dental implants, energy and defence, tooling and industrial, and service bureaus, on metal powder-bed fusion, directed energy deposition and polymer SLS, MJF and FDM. Most floors pick one machine and one wedge, prove the number, then expand.

AerospaceBrackets, nozzles, structural parts

Aerospace

Qualified part families where one failed build or failed qualification is expensive. Meltrix and Poroscan on one metal PBF printer first, with the AS9100 evidence packet attached.

Medical and dental implantsTi and CoCr implants

Medical and dental implants

Porosity and surface faults are patient safety. CT grading against acceptance criteria with a named sign-off, genealogy for every implant.

Energy and defencePressure-bearing and reshored parts

Energy and defence

Serial production under qualification and reshoring pressure. Build-failure prediction and fleet scheduling with Yieldex as the floor scales.

Tooling and industrialConformal-cooled tooling, series parts

Tooling and industrial

Cost per part decides the business. Parttwin to cut coupon campaigns and ramp scrap, Forgebot to reclaim idle machine time.

Service bureausMulti-machine, multi-material fleets

Service bureaus

Many customers, many part families, one floor. Yieldex scheduling across machines, ovens and inspection, with per-customer genealogy.

Run timeline · scenario

One scenario run, step by step

Every Powdrix run is an ordered, inspectable sequence. This is run_7c2e4b on PBF-2 · Ti-6Al-4V bracket family, 24-part build. Scenario completes in 10 steps with one approval gate. Twin recipe #14 selected, one lack-of-fusion precursor at layer 1,872 cleared by a bounded power trim, CT triage in 11 minutes, 23 of 24 parts released with full genealogy and one held for review.

run_7c2e4b PBF-2 · Ti-6Al-4V bracket family, 24-part build illustrative scenario SUCCEEDED
  1. 01 ingest.job SUCCEEDED 0.7 s

    Floor Orchestrator · Pulled the job from AM MES: 24 Ti-6Al-4V brackets, 60 µm layers, 3,140 layers, density target 99.7%, geometry tolerance ±0.10 mm, AS9100 evidence packet required. Locked the OEM-approved parameter envelope for PBF-2.

  2. 02 twin.simulate SUCCEEDED 6 m 12 s

    Part Twin · Simulated 40 candidate orientation, support and parameter recipes for thermal field, residual stress and distortion, ranked on predicted density, geometry deviation, takt and energy.

  3. 03 prep.release SUCCEEDED 48 s

    Prep-and-Parameter · Recipe #14 released: 32° orientation, lattice supports on two faces, laser power and speed inside the qualified envelope. Predicted distortion 0.06 mm, predicted density 99.8%.

  4. 04 recoat.check SUCCEEDED continuous

    Recoat-and-Powder · Recoater image checked every layer. Powder lot L-2291 on its third reuse, humidity in window. One short-feed at layer 412 corrected with a dosing increase before the next layer fused.

  5. 05 melt.stabilise SUCCEEDED continuous

    Melt-and-Layer · Melt-pool, photodiode and thermal streams fused at 120 fps. Lack-of-fusion risk rose to 0.61 on part 17 at layer 1,872 and was cleared by a 3% power trim inside the envelope within four layers.

  6. 06 thermal.compensate SUCCEEDED 2 m 04 s

    Thermal-and-Distortion · Interlayer temperature on the tall brackets ran 14 °C above the twin's prediction from layer 2,300. A 1.5 s interlayer dwell held the thermal field inside the predicted band through the top section.

  7. 07 approve.human APPROVAL 4 m 30 s

    Floor Orchestrator · Melt-and-Layer proposed a hatch-spacing change on part 17 beyond the qualified envelope. Held for the AM process engineer, who declined it and chose to flag part 17 for CT priority instead. Decision logged.

  8. 08 handle.depowder SUCCEEDED 38 m

    Robot-and-Handling · Plate unloaded by the handling cell on build complete, depowdered, and parts transferred to stress relief. Powder returned to the sieve with lot L-2291 reuse count incremented in genealogy.

  9. 09 inspect.ct SUCCEEDED 11 m

    Defect-and-Inspect · 24 CT volumes segmented for pores, cracks and lack of fusion in 11 minutes. 23 parts graded accept against the acceptance criteria. Part 17 shows a 180 µm indication at layer 1,870 and is routed to the inspector for disposition.

  10. 10 release.qualify SUCCEEDED 1 m 20 s

    Quality-and-Conformance · 23 parts released with the full genealogy: recipe, layer tags, melt-pool events, thermal trace, approvals, post-processing cycles and CT result. Part 17 held with a non-conformance opened. Evidence packet assembled for sign-off.

Who it is for

Built for the people who run the floor

We have no customer quotes to show yet and will not invent any. These are the three roles on an additive floor we build for, and the problems they bring to the first meeting.

AM or Operations Director

Owns build throughput, quality, build-failure and yield, qualification and cost per part.

What this person is dealing with today

  • Fixed parameters and manual build prep that cap density, geometry and yield
  • Scrapped multi-hour or multi-day builds and high energy eroding cost per part
  • A severe, scarce AM process-engineer shortage that caps fleet scale-up

AM Process Engineer

Owns build prep, parameters, in-situ interpretation, thermal and distortion, and post-processing recipes.

What this person is dealing with today

  • Melt-pool instability, porosity, lack of fusion and spatter driving scrapped builds
  • Recoat streaks and powder-quality faults ruining long builds
  • Terabytes of in-situ data that nobody has time to read

Quality or Certification Engineer

Owns part quality to AS9100, ISO 13485 and ASTM and ISO AM standards, defect conformance and build genealogy.

What this person is dealing with today

  • Failed qualifications and evidence assembled by hand
  • Hidden pores and lack of fusion that pass spot CT and fail in the field
  • Build prep, in-situ, post-processing and inspection siloed and reactive across the fleet
Autonomy

Four levels, set per agent and per machine

A qualified floor does not go from manual to unattended in one step. Powdrix makes the level explicit, auditable and reversible at any time, and human approval for anything that affects qualification stays mandatory until validation exists. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryPredicts and recommends, with citations; nothing is writtenEnters every change manuallyShadow mode on one machine, first weeks of a pilot
L2 · SupervisedProposes a parameter, thermal or inspection move; it executes on approvalApproves each move in the review consoleAssist mode once accuracy is measured against CT
L3 · BoundedWrites inside the OEM-approved parameter envelope and per-tag limitsApproves anything that leaves the envelope or affects qualificationGraduated autonomy on low-risk loops, if the floor is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; only after validation on the part family
Pricing

Priced per machine, per floor, per group

Land on one printer with a measured baseline. Expand by machine, module, floor and autonomy level. Outcome components are available on build failure, yield, qualification and energy. Annual prepay carries a 15 to 20% discount.

Billing period
Machine $6,000 per AM machine / month · billed monthly

In-situ, parameter-control or inspection AI for one printer. For manufacturers validating ROI on the wedge.

  • One printer or inspection cell, one agent module
  • Printer-edge Jetson node included
  • Machine, camera and CT reads, bounded writes inside the envelope
  • Run log, audit trail, build genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $500k to $7M ACV

Multi-site AM manufacturers and bureaus standardising on Powdrix, with custom alloy, polymer and qualification models.

  • Multi-site floor-edge fleet
  • Custom alloy, polymer and qualification models
  • On-prem GPU inference option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
  • Validated model change control and evidence packs
Contact us
FAQ

Straight answers

The questions operations directors, process engineers and certification engineers ask in the first meeting.

Only inside the OEM-approved parameter envelope, only on an explicit allow-list with per-tag limits, and only at the autonomy level your floor has set. Level 1 is advisory: Powdrix predicts and recommends and a human enters everything. Design partners start there, in shadow mode. Anything that leaves the envelope or affects qualification always waits for a named approver.

Get started

Name the machine that costs you the most

Start with one printer or one inspection cell and one measurable baseline. A paid pilot on melt-pool and build-failure prediction, CT porosity triage or pre-build recipe optimisation shows the number before you commit further.