Powdrix is pre-launch. We have no customers to name and will not borrow logos. This page says who the product is for, what a design partner commits to, and who we deliberately do not target.

Pre-launch3 to 5 design partnersPaid pilot on one machine

Ideal customer

Industrial additive manufacturers and service bureaus, $50M to $20B revenue

Aerospace, medical and dental implant, tooling, energy, defence and industrial-part producers running metal powder-bed fusion, directed energy deposition and polymer SLS, MJF and FDM fleets plus post-processing, and captive AM operations inside larger OEMs.

metal PBFDEDpolymerCTAM MES
Qualification

What makes a good first floor

The criteria we check, in order.

We look for

  • Enough build volume and part value to drive a clear ROI; scrapped builds and failed qualifications are costly
  • Existing slicer or build-prep, in-situ monitoring, CT or inspection and MES systems with API access
  • An executive mandate to raise yield or cut build-failure and qualification cost and scale AM production
  • Willingness to run a paid pilot with a defined build-failure, yield or qualification success metric

We do not target

  • Hobbyist or desktop 3D-printing users with no production or qualification scope
  • Sites unwilling to integrate slicer, in-situ, CT and MES systems under IP and security controls
  • Buyers looking for a horizontal dashboard rather than a system that acts
Design partner programme

What the first cohort gets and gives

Three to five floors in aerospace, medical implant, defence, energy or service-bureau environments that agree to baseline build-failure, yield, CT and porosity, qualification-cost and engineer-review metrics.

  1. Shadow mode. We connect to the wedge workflow on one machine, observe and measure the baseline. Nothing is written.
  2. Assist mode. The agent recommends parameter, orientation or thermal moves and predicts porosity, distortion and failure. Your engineer approves each one. Accuracy and ROI are measured against the signed baseline and real CT outcomes.
  3. Graduated autonomy. Low-risk in-situ, parameter and inspection loops run inside the envelope with exceptions escalated, if the floor is satisfied with the recommendations.
  4. Conversion. The pilot converts to the Machine tier and expands machine by machine. Design partners get written access terms for telemetry and outcomes, and a say in the roadmap.
Who it is for

Built for the people who run the floor

We have no customer quotes to show yet and will not invent any. These are the three roles on an additive floor we build for, and the problems they bring to the first meeting.

AM or Operations Director

Owns build throughput, quality, build-failure and yield, qualification and cost per part.

What this person is dealing with today

  • Fixed parameters and manual build prep that cap density, geometry and yield
  • Scrapped multi-hour or multi-day builds and high energy eroding cost per part
  • A severe, scarce AM process-engineer shortage that caps fleet scale-up

AM Process Engineer

Owns build prep, parameters, in-situ interpretation, thermal and distortion, and post-processing recipes.

What this person is dealing with today

  • Melt-pool instability, porosity, lack of fusion and spatter driving scrapped builds
  • Recoat streaks and powder-quality faults ruining long builds
  • Terabytes of in-situ data that nobody has time to read

Quality or Certification Engineer

Owns part quality to AS9100, ISO 13485 and ASTM and ISO AM standards, defect conformance and build genealogy.

What this person is dealing with today

  • Failed qualifications and evidence assembled by hand
  • Hidden pores and lack of fusion that pass spot CT and fail in the field
  • Build prep, in-situ, post-processing and inspection siloed and reactive across the fleet
Segments

Where additive floors start

Aerospace, medical and dental implants, energy and defence, tooling and industrial, and service bureaus, on metal powder-bed fusion, directed energy deposition and polymer SLS, MJF and FDM. Most floors pick one machine and one wedge, prove the number, then expand.

AerospaceBrackets, nozzles, structural parts

Aerospace

Qualified part families where one failed build or failed qualification is expensive. Meltrix and Poroscan on one metal PBF printer first, with the AS9100 evidence packet attached.

Medical and dental implantsTi and CoCr implants

Medical and dental implants

Porosity and surface faults are patient safety. CT grading against acceptance criteria with a named sign-off, genealogy for every implant.

Energy and defencePressure-bearing and reshored parts

Energy and defence

Serial production under qualification and reshoring pressure. Build-failure prediction and fleet scheduling with Yieldex as the floor scales.

Tooling and industrialConformal-cooled tooling, series parts

Tooling and industrial

Cost per part decides the business. Parttwin to cut coupon campaigns and ramp scrap, Forgebot to reclaim idle machine time.

Service bureausMulti-machine, multi-material fleets

Service bureaus

Many customers, many part families, one floor. Yieldex scheduling across machines, ovens and inspection, with per-customer genealogy.

Run timeline · scenario

One scenario run, step by step

Every Powdrix run is an ordered, inspectable sequence. This is run_7c2e4b on PBF-2 · Ti-6Al-4V bracket family, 24-part build. Scenario completes in 10 steps with one approval gate. Twin recipe #14 selected, one lack-of-fusion precursor at layer 1,872 cleared by a bounded power trim, CT triage in 11 minutes, 23 of 24 parts released with full genealogy and one held for review.

run_7c2e4b PBF-2 · Ti-6Al-4V bracket family, 24-part build illustrative scenario SUCCEEDED
  1. 01 ingest.job SUCCEEDED 0.7 s

    Floor Orchestrator · Pulled the job from AM MES: 24 Ti-6Al-4V brackets, 60 µm layers, 3,140 layers, density target 99.7%, geometry tolerance ±0.10 mm, AS9100 evidence packet required. Locked the OEM-approved parameter envelope for PBF-2.

  2. 02 twin.simulate SUCCEEDED 6 m 12 s

    Part Twin · Simulated 40 candidate orientation, support and parameter recipes for thermal field, residual stress and distortion, ranked on predicted density, geometry deviation, takt and energy.

  3. 03 prep.release SUCCEEDED 48 s

    Prep-and-Parameter · Recipe #14 released: 32° orientation, lattice supports on two faces, laser power and speed inside the qualified envelope. Predicted distortion 0.06 mm, predicted density 99.8%.

  4. 04 recoat.check SUCCEEDED continuous

    Recoat-and-Powder · Recoater image checked every layer. Powder lot L-2291 on its third reuse, humidity in window. One short-feed at layer 412 corrected with a dosing increase before the next layer fused.

  5. 05 melt.stabilise SUCCEEDED continuous

    Melt-and-Layer · Melt-pool, photodiode and thermal streams fused at 120 fps. Lack-of-fusion risk rose to 0.61 on part 17 at layer 1,872 and was cleared by a 3% power trim inside the envelope within four layers.

  6. 06 thermal.compensate SUCCEEDED 2 m 04 s

    Thermal-and-Distortion · Interlayer temperature on the tall brackets ran 14 °C above the twin's prediction from layer 2,300. A 1.5 s interlayer dwell held the thermal field inside the predicted band through the top section.

  7. 07 approve.human APPROVAL 4 m 30 s

    Floor Orchestrator · Melt-and-Layer proposed a hatch-spacing change on part 17 beyond the qualified envelope. Held for the AM process engineer, who declined it and chose to flag part 17 for CT priority instead. Decision logged.

  8. 08 handle.depowder SUCCEEDED 38 m

    Robot-and-Handling · Plate unloaded by the handling cell on build complete, depowdered, and parts transferred to stress relief. Powder returned to the sieve with lot L-2291 reuse count incremented in genealogy.

  9. 09 inspect.ct SUCCEEDED 11 m

    Defect-and-Inspect · 24 CT volumes segmented for pores, cracks and lack of fusion in 11 minutes. 23 parts graded accept against the acceptance criteria. Part 17 shows a 180 µm indication at layer 1,870 and is routed to the inspector for disposition.

  10. 10 release.qualify SUCCEEDED 1 m 20 s

    Quality-and-Conformance · 23 parts released with the full genealogy: recipe, layer tags, melt-pool events, thermal trace, approvals, post-processing cycles and CT result. Part 17 held with a non-conformance opened. Evidence packet assembled for sign-off.

Autonomy

Four levels, set per agent and per machine

A qualified floor does not go from manual to unattended in one step. Powdrix makes the level explicit, auditable and reversible at any time, and human approval for anything that affects qualification stays mandatory until validation exists. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryPredicts and recommends, with citations; nothing is writtenEnters every change manuallyShadow mode on one machine, first weeks of a pilot
L2 · SupervisedProposes a parameter, thermal or inspection move; it executes on approvalApproves each move in the review consoleAssist mode once accuracy is measured against CT
L3 · BoundedWrites inside the OEM-approved parameter envelope and per-tag limitsApproves anything that leaves the envelope or affects qualificationGraduated autonomy on low-risk loops, if the floor is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; only after validation on the part family
FAQ

Straight answers

The questions operations directors, process engineers and certification engineers ask in the first meeting.

Only inside the OEM-approved parameter envelope, only on an explicit allow-list with per-tag limits, and only at the autonomy level your floor has set. Level 1 is advisory: Powdrix predicts and recommends and a human enters everything. Design partners start there, in shadow mode. Anything that leaves the envelope or affects qualification always waits for a named approver.

Get started

Apply as a design partner

Tell us the machine, the metric and the baseline you would sign. We will tell you honestly whether the wedge fits.